• Project Information
  • Project Name King Faisal Air Academy Project - Main Water Supply Transmission Line.
  • End Client Ministry of Defense / the royal Saudi air forces (RSAF)
  • Main Contractor The Joint Venture Formed of Nesma and Almabani
  • Location Majmaa in Riyadh
  • Scope of Work Welding & Installation of Ø 34 inches steel casing pipes then insertion of DN600 mm GRP carrier pipe.
  • Total Length Executed 373 linear meters
  • Start Date 26 May 2021
  • Completion Date 30 Nov 2021

Project Facts:

  • Fast Track project.
  • Supplying of water to critical facilities.
  • Construct the tunnels underneath Highways & Railway.
  • Installation of pipe sleeve had reached the maximum machine capacity in terms of pipe size.

Critical Success Factors:

  • Provided a suitable team of well-experienced staff
  • Worked nonstop 24hours/7 days.
  • A special ancillary tool (40 inches Reamer) was supplied to enhance processes and improve compatibility with working conditions.