Project Name King Faisal Air Academy Project - Main Water Supply Transmission Line.
-
End Client Ministry of Defense / the royal Saudi air forces (RSAF)
-
Main Contractor The Joint Venture Formed of Nesma and Almabani
-
Location Majmaa in Riyadh
-
Scope of Work Welding & Installation of Ø 34 inches steel casing pipes then insertion of DN600 mm GRP carrier pipe.
-
Total Length Executed 373 linear meters
-
Start Date 26 May 2021
-
Completion Date 30 Nov 2021
Project Facts:
- Fast Track project.
- Supplying of water to critical facilities.
- Construct the tunnels underneath Highways & Railway.
- Installation of pipe sleeve had reached the maximum machine capacity in terms of pipe size.
Critical Success Factors:
- Provided a suitable team of well-experienced staff
- Worked nonstop 24hours/7 days.
- A special ancillary tool (40 inches Reamer) was supplied to enhance processes and improve compatibility with working conditions.